SENDIN Group supplies rebar to customers according to their needs. The iron is cut, bent and welded based on the technical specifications and the specific drawings to each construction.

Our products are purchased by two types of companies: those with assemblers at the construction site that only require the unassembled iron, and those companies that work with deep foundations drilled into the ground and require already assembled products.

Since SENDIN NEGOCE owns production plants in France and Spain, we are able to supply products in both countries, therefore meeting the needs of SMEs.

 

9 SENDIN SPAIN

SENDIN SPAIN PLANT

The plant in Teruel (Spain) is located inside a 22,200 m2 building on a 55,000 m2 plot and has a production capacity of 5,000 tons of reinforcement steel per month (with a production capacity of 10,000 tonnes). It opened in 2010 with the latest technology in production machinery. Its key principles are quality service and short delivery times.

Arturo Sendin Álvarez and Sergio Sendin have contributed all of their knowledge and experience for this plant to become the flagship of the Group.

 

10 CHILLY

SENDIN CHILLY-MAZARIN PLANT

The Chilly-Mazarin plant, in district 91 in France, is built over a 25,000 m2 plot and has a 5,000 m2 workshop. It has a production capacity of 3,000 tonnes of reinforcement steel per month.
This plant, which manufactures, breaks up and transports reinforcement steel, was opened in 2007.

Furthermore, each production batch is labelled to make the subsequent assembly easier. By means of a powerful computer system, the measurements of the products to be manufactured are introduced into the system. This information, which is transmitted directly by computer to our machines, allows the pieces to be manufactured just by reading the bar code generated during break-up. Both plants use the same system.